News
Products
Steps for Achieving Zero Drilling Waste Discharge
2014-06-19

Xi'an KOSUN Machinery Co., Ltd., integrating both domestic and foreign advanced solutions and experience in well drilling and completion waste management, has laid down an integrated solution for drilling waste treatment,called "Inverted Pyramid" Integrated Waste Treatment Solution, after repeated researches and experiments, which goes through four steps as reducing waste discharge at source, recycling wastewater, recovering drilling mud, reprocessing waste by means of four-stage solids control system before realizing zero discharge of waste, offering high-quality drilling waste treatment services for projects.uipment.

Reducing waste discharge at source

It means beginning with the moment when drilling fluids starts circulating. The Company has already begun its integrated solution for drilling waste management. KOSUN Oilfield Solids Control System will connect directly to the overflow, and will recover maximum mud and discharge minimum waste following a four-stage separation of the solid phase via linear motion shale shaker, desander, desilter and drilling centrifuge. In this way, it makes the best of solids control system, retrieves more mud, reduces mud adhered to drill cuttings and minimizes useless drill cuttings.
 

drilling waste treatment
 

Recycling wastewater

Water is the most essential source and is most easily to be contaminated at well sites, especially at oil & gas exploration sites mostly distributed in water-scarce areas where water is invaluable and it is a high necessity to properly utilize and recycle it. The second step is dewatering and water treatment since solids contain abundant water being removed by drilling solids control system. The solution processes mud up to standard via high-speed centrifuge, filtering system, purification system, etc. and reuse it at drilling oilfields.

Recovering drilling mud

Hi-G dryer and vertical centrifuge dryer can be introduced as drill cuttings usually take away much drilling mud and thus raise drilling cost. Hi-G dryer manages oil content and water content down to 10% from 30% while vertical cutting dryer lowers oil on cuttings below 5%, to the greatest degree, with small rotary speed and centrifugal filtration. Either of them is effective to recover drilling mud and shrink drilling cost.

Zero discharge of waste

Zero waste discharge still remains a bit away after going through the previous four steps, therefore solidification, thermal desorption, cuttings reinjection and biodegradation will be utilized to push towards the goal as the last step. Hi-G dryer: KOSUN Hi-G Dryer can recover water- and oil-based mud in drill cuttings with fluid phase down below 10% and remarkable reduction on waste discharge cost. It is especially good at managing oil-based drill cuttings

Copyright 1992- by KOSUN Group All rights reserved.
All rights reserved Branch Xun mechanical layout and content of this website shall not be reproduced without written authorization and modeled